Junkers Neckar heater microswitch 87072000200
MICROINTERRUPTOR HEATER JUNKERS NECKAR 87072000200 MICROINTERRUPTOR IGEND FOR HEATER JUNKERS WR11, WR14 WR ... etc. [...]
Sea
Putzmeister and Tratolixo: energy generation and composting through urban waste
The waste plant that Tratolixo has in Abrunheira, near Lisbon, has managed since 2012 [...]
Jul
The use of forest biomass as renewable energy, key to preventing fires
According to the latest "Report on forest fires in Spain" from the Ministry for the Ecological Transition [...]
Jul
30,000 biomass jobs at risk for remuneration lower than real costs
The national biomass sector has received a serious setback with Order TED/526/2024 [...]
Jun
The first neighborhood-scale heat plant and network powered by forest chip biomass is already underway
The President of the Government of Navarra, María Chivite, has officially inaugurated in the Pamplona neighborhood [...]
May
Nestlé expands the steam production capacity of the biomass boiler at its Cantabrian factory
Nestlé, through Bioenergy Ibérica, a company specialized in the construction of renewable energy projects [...]
Sea
The manufacture and consumption of pellets in Spain increased during 2022
The estimates for the year that is ending continue along the same lines: the plants could [...]
Jan
Pellet manufacturing and consumption increases in Spain
The Spanish Biomass Association (AVEBIOM) has published the latest statistical report on the [...]
Jan
Hunosa awards the project and work of the biomass transformation of the La Pereda power plant
The Board of Directors of Hunosa has authorized the award of the contract for drafting the project [...]
Dec
New recommendations for the consumption of biomass and biogas in EU ETS facilities
The Emissions Trading Technical Group of the Emissions Policy Coordination Commission [...]
Oct